TL;DR: There is no single HVAC deposit percentage that works everywhere. In California, the maximum down payment is $1,000 or 10% of the contract price, whichever is less.
California limits the down payment before an HVAC replacement
California gives HVAC contractors a hard number. The California Contractors State License Board Industry Bulletin #22-14, dated November 22, 2022, says home improvement contracts can collect a maximum down payment of $1,000.
The contract must also follow this rule: later payments cannot exceed the value of materials and work performed.
California requires a “Down Payment” heading, the dollar amount, and this statement in at least 12-point boldface:
“THE DOWN PAYMENT MAY NOT EXCEED $1,000 OR 10 PERCENT OF THE CONTRACT PRICE, WHICHEVER IS LESS.”
If the contract includes progress payments, each payment must show the amount and the work, materials, or services it covers. Those terms belong under the heading “Schedule of Progress Payments.”
The required language also says it is against the law to collect payment for work not yet completed or materials not yet delivered. A contractor may still require a down payment.
Violators can face CSLB disciplinary action and inclusion on the Public Utilities Commission Watch List. A violation of the down payment and progress payment restrictions in section 7159.5 is punishable as a misdemeanor.
This is a 2022 bulletin. Re-check the current statute text before changing your policy.
Your deposit should cover the shop’s real exposure
The right deposit starts with one question: what does the shop lose if the customer cancels?
A special-order air handler or non-stock condenser costs the shop real money. It may also carry restocking fees. A stock unit already on the truck creates a different risk. The shop may have little money tied up in that equipment.
A crew slot held for a replacement also has value. So does a permit already pulled. Those facts do not create a universal deposit percentage. They tell you what your written cancellation terms need to address.
Homeowner-facing advice pages commonly say a deposit covering materials and scheduling is reasonable. They also often call 50% or more before work starts a red flag, and they tell customers to walk away from full payment before installation begins.
Those are rules of thumb from consumer and financing blogs. They are not an industry survey or a universal contractor standard.
Put the cancellation terms in writing before ordering equipment
A common pattern in HVAC shops is simple. The deposit conversation feels awkward at the kitchen table, so the office manager skips it. The issue comes up only after the equipment is ordered.
That is too late for a clean conversation.
Give the customer the deposit amount and what it covers when the quote is presented. Put the cancellation terms in the written agreement. Have the customer sign before equipment is ordered.
State what is refundable and what is not. State when that changes, such as after equipment is ordered or a permit is pulled. Use plain language. The customer should know the consequence before the shop commits money or holds a crew slot.
This is the same reason you should say the diagnostic fee on the phone instead of waiting until the technician reaches the door. Use the same approach for replacement deposits and cancellation terms. Tell customers the diagnostic fee on the phone, not at the door.
A clear written term also helps when the customer compares another quote. A customer who hesitates at the deposit is often comparing quotes. An open quote is still a live lead. Follow up with the terms instead of treating the hesitation as a lost job. See how open quotes can keep replacement leads alive.
Do not collect for materials your state says are not delivered
California’s rules show why a percentage copied from another shop can create trouble. A deposit policy that seems ordinary in one state may violate another state’s law.
Some states do not cap deposits the same way. Others impose different contract language, progress payment, or delivery requirements. Check your own state contractor licensing board before setting a deposit policy. Re-check the current statute text before relying on an older bulletin or form.
Do not collect for materials not yet delivered where state law prohibits it. Stage payments around lawful delivery and completion milestones. List the amount and the work, materials, or services covered by each payment.
This is not legal advice. Confirm your policy with your state licensing board or a construction attorney.
Make the first call part of the deposit process
Replacement terms should not first appear when the installer is loading equipment. The office should know what the caller wants, whether the job appears to be a replacement, and what follow-up is needed before a crew slot is held.
Dial 72 answers calls 24/7 and texts the shop a triage and call summary after each call. For a replacement inquiry, the summary can flag the call as a likely replacement lead. The office can then follow up with the deposit and cancellation terms before equipment is ordered or a crew slot is held. Dial 72 also books on the shop’s calendar.
Use that process to change the conversation. Quote the deposit clearly. Explain what it covers. Send the written terms. Get the signature before ordering equipment.
The practical rule is direct: set the deposit from your actual unrecoverable exposure, then check the amount and payment schedule against your state’s current law. Never make the customer discover those terms at the door. For more on turning replacement inquiries into booked work, see winning replacement leads.




